HOME  »  Apogee Saturn V Construction »  Viewing TunnelCoverCutOut     [Image 30 of 141]  :: Jump To  
  Previous slide      Show/Hide EXIF Info Index Page Start/Stop the slide show      Next slide  
 
TunnelCoverCutOut - Saturday, February 14, 2009 23:37
First stage tunnel cover cut-out (so it lies flat all the way along its length, rather than having a gap between the tunnel cover and the body tube between the wraps).
Album last updated on Sunday, August 23, 2009 13:27
Powered by Jalbum 8.1 and BluPlusPlus skin
Copyright © 2008-2009 by Alan M. Marcum. All rights reserved.